Large Centrifugal Fan Installation and Inspection by Xianrun Blower

Large Centrifugal Fan Installation and Inspection by Xianrun Blower

When the large centrifugal fans finish the installation, make the inspection before test running, these industrial fans and blowers can not operation until reach the requirements. 
Custom Heavy Duty Industry Fans for Power Plant
A. Check whether the large centrifugal fan assembly is in meeting the drawing and specification requirements, there should not be any sundries ( open the access door on the air inlet or soot cleaning door in the casing), clean the sundries and setting tools around the large centrifugal fan. 
Large Capacity Industrial Radial Fans
B. Check whether all the connecting bolts and binding bolts are tight. 
C. Check whether all electrical equipment are installed by the requirements; wirings are correct; the instrument and apparatus are in good condition.
High Capacity Double Suction Fans for Power Plant
D. Check whether the oil system is smooth. 
E. Test running the main motor, hydraulic coupling, dilute gas station, etc. independently, after confirming all parts can work normally, then the whole unit centrifugal fan test run.